P302
UF feed pump
Intended impact: Stop inflow of tank T-401
- Physical Residual
- Temporal Sequence
- Process Invariants
- Fused Ensemble
Labelled attacks from two public ICS datasets, replayed through the Vardar detection stack. Every record shows the plant stage the attacker touched, the detection timeline and the per-sensor evidence behind the result. Public, no login.
A known event with a defined start, duration and intended impact, from the iTrust ground-truth catalog.
When each engine flagged the window, measured from the labelled onset, and which engines never did.
The process signals that support the result, not only the verdict.
iTrust Secure Water Treatment testbed (SUTD). A six-stage plant, 36 labelled attacks over four attack days.
Provenance Recall is point-adjusted on labelled attacks; the false-positive rate is measured on held-out clean data. Every figure traces to the run, the model image and the artefact checksum shown here. Validation run 2026-06-11T22:34:18Z, model image sha-97752838a3f3, metrics artefact SHA-256 80c98149b000d88af3fc7b58ab407a24c81f3839426e7d4e53c2011bbf15c52a.
UF feed pump
Intended impact: Stop inflow of tank T-401
UV dechlorinator unit; RO feed ORP analyzer; RO high-pressure pump
Intended impact: Possible damage to RO
RO high-pressure pump; RO permeate flow meter
Intended impact: Reduced output
pH analyzer (HCl dosing control)
Intended impact: P-203 turns off; Change in water quality
RO permeate conductivity analyzer
Intended impact: RO shut down sequence starts after 30 minutes. Water should go to drain.
iTrust Water Distribution testbed (SUTD). A three-stage distribution network, 16 labelled attacks.
Provenance Recall is point-adjusted on labelled attacks; the false-positive rate is measured on held-out clean data. Every figure traces to the run, the model image and the artefact checksum shown here. Validation run 2026-06-13T22:27:18Z, model image sha-de79dac53981, metrics artefact SHA-256 a05be50d6a12ad442d292f0b9759d4087430c537fcc3b93712812ff55d5605bb.
raw-water booster pump P5 (commanded ON); raw-water booster pump P6 (commanded OFF)
primary-grid inlet flow meter (chemical-dosing line)
Intended impact: No increase in level in primary grid
elevated-reservoir tank level transmitter
Intended impact: Stealthy attack
SWaT and WaDi datasets courtesy of iTrust, Centre for Research in Cyber Security, Singapore University of Technology and Design. Detection figures trace to the reproducible model runs shown with each dataset.
A technical evaluation on one critical process, with success criteria agreed in advance, produces the only figure that applies to your site.