All caught attacksAttack walkthrough / evidence trace / WaDi 2017

Attack #101P005ON + 1P006OFF

Raw-water booster pump P5 (commanded ON) and raw-water booster pump P6 (commanded OFF). The iTrust catalog records no intended impact for this attack.

Single Stage, Multi PointWater Distribution1m 32s windowfirst catch 7s1 of 1 engines flagged it
1.0Plant

Where it hit the plant

P1

primary grid, raw-water intake & dosing

1P005ON1P006OFF
P2

elevated reservoir, secondary distribution

P3

consumer / return network

2.0Timeline

Attack window and detections

Labelled window2017-10-11 10:55:00 to 2017-10-11 10:56:27plant local time
Physical Residual
7s

Shaded band: the labelled attack window from the iTrust ground-truth catalog. Marks: the first second each engine flagged the window. "No flag" means the engine stayed silent for the whole window.

3.0Evidence

Why it was flagged

At 2017-10-11 10:55:00, attack #10 (SSMP) manipulated 1P005ON, 1P006OFF — “Pipe bursts”. The serving model raised the alert 7 seconds after onset (peak score 3.4178x the operating threshold). The dominant physical evidence: 1P006 — raw-water booster pump P6, Stage 1 (primary grid — raw-water intake & dosing) was driven to a state the plant's learned physics did not predict from the rest of the process, carrying 79% of the anomaly score — 1226x its share in normal operation. Supporting deviations were concentrated in 2FIT001, 1P005, 2MV003. In plain terms: the plant's own physics stopped agreeing with what the sensors were reporting, in exactly the part of the process the attacker touched.

From the official explain run 2026-06-14T18:37:06Z
Peak score 3.42x of the operating threshold

Sensors carrying the anomaly score

SensorShare of scoreDeviationShare vs normal
1P006
raw-water booster pump P6, Stage 1 (primary grid — raw-water intake & dosing)
79.3%198.9σ1226.0x
2FIT001
flow meter, Stage 2 (elevated reservoir — secondary distribution)
2.4%6.2σ3.1x
1P005
raw-water booster pump P5, Stage 1 (primary grid — raw-water intake & dosing)
2.0%5.1σ2.8x
2MV003
elevated-reservoir feed motorized valve, Stage 2 (elevated reservoir — secondary distribution)
0.8%2.2σ1.2x
2AAIT003
plant instrument, Stage 2 (elevated reservoir — secondary distribution)
0.5%-1.2σ0.2x
2_FIC_201_SP
plant instrument, Stage 2 (elevated reservoir — secondary distribution)
0.5%-1.1σ0.2x
3AIT004
water-quality analyzer, Stage 3 (consumer / return network)
0.4%1.1σ0.4x
2AAIT004
plant instrument, Stage 2 (elevated reservoir — secondary distribution)
0.4%-0.9σ0.2x
4.0Provenance

Every figure has a run.

Validation run

2026-06-13T22:27:18Z, commit de79dac5398150de9bc5eda89a529d2dbb942c6c

Model image

sha-de79dac53981

Metrics artefact SHA-256

a05be50d6a12ad442d292f0b9759d4087430c537fcc3b93712812ff55d5605bb

Explain run

2026-06-14T18:37:06Z

Explain artefact SHA-256

ce5f77ae0bc78a0576ec3ca053b5594844039f7f77c0aa2ba63850a9bf46874f

Generator

vardar-portal/scripts/build-gallery-data.mjs (DEL-34/DEL-43)

SWaT and WaDi datasets courtesy of iTrust, Centre for Research in Cyber Security, Singapore University of Technology and Design. Detection figures trace to the reproducible model runs shown with each dataset.

More caught attacks from WaDi 2017Attack #2Attack #16All caught attacks